Installation Essentials:

We recommend to have zeero leveled sub-floor for installation of LVT

Use self leveling compound to level the floor.

The planks should be kept under room temperature maintained between 18-23 .C before & during installation.

The planks should be allowed to acclimate in the room & should be stacked flat on the floor to avoid bendin.

Maintenance:

Regularly sweep floor with a damp mop.

To maintain aesthetics, Use a damp mop/vaccum cleaner daily.

For heavy soiled areas, scrub with a floor cleaning solution.